IEC 60364-4-41 · Edition 2005+A1:2017 EB SUMMARY

§411.5 TT-system — automatic power-off time

In a TT system, the source neutral is earthed independently, and each load (or group of equipotentially bonded equipment) has its own local earth electrode, not metallically looped to the source earth. Consequently, the L-PE fault loop impedance is dominated by soil resistance between the two electrodes and is typically too high for reliable overcurrent device operation. **The primary means of automatic disconnection must be an RCD.** **The condition** `R_A × I_ΔN ≤ U_L` **must be met**, where `R_A` is the resistance of the local earth electrode plus protective conductor, `I_ΔN` is the rated residual operating current, and `U_L` is the touch voltage limit of 50 V AC. For final circuits of stationary equipment up to 32 A (or 63 A for socket-outlet final circuits) at U_0 = 230 V AC, maximum disconnection time is 0.2 s (other U_0 values per Table 41.1); for distribution and other circuits, up to 1 s is allowed. Verification of R_A and functional RCD testing at commissioning are key compliance checks.
EB-authored summary for design convenience — NOT normative IEC text. Official standard IEC 60364-4-41:2005+A1:2017 available at webstore.iec.ch →.
Explain in plain words
In plain words
AI-generated — may contain inaccuracies

In a TT system, the equipment enclosure is earthed via its own local earth electrode, not metallically connected to the source earthing, so the fault current passes through the ground and is usually too low to reliably trip a circuit breaker. Therefore, in TT, the main protective device must be an RCD. The condition here is different: R_A × I_ΔN ≤ 50 V, where R_A is the resistance of the local earth electrode and I_ΔN is the rated residual operating current of the RCD; hence, the worse the earth electrode, the more sensitive the RCD must be. The disconnection time for final circuits is 0.2 s. In practice, for a TT installation, it is critical to install an RCD at the supply intake or on circuits and check the earth resistance and actual RCD operation using the 'Test' button and a tester during commissioning.